Shrout Tate Wilson Engineering LogoShrout Tate Wilson Engineering LogoShrout Tate Wilson Engineering LogoShrout Tate Wilson Engineering Logo
  • About Us
  • Services
  • Portfolio
  • People
  • News
  • Connect
  • People
  • News
  • Connect
  • Projects Title
    Title Triangle
    PORTFOLIO
    Our projects focus on the places in your community where people learn, play, live, work, worship, eat, heal & connect.
  • Filter by
  • Categories
  • Show all
  • All
  • Current Projects
  • Play
  • Live
  • Work
  • Eat
  • Heal
  • Connect
  • Restore
  • Learn
  • Healthfirst of Kentucky Bluegrass – The MET

    Read more
    Healthfirst of Kentucky Bluegrass – The METHeal
    Healthfirst of Kentucky Bluegrass – The MET
    The HealthFirst Bluegrass clinic, located in Lexington’s historic East End, serves the community by offering comprehensive medical care, including primary care, pediatrics, women’s health, behavioral health, dentistry, and pharmacy services. Designed with both functionality and comfort in mind, the clinic prioritizes accessibility and patient well-being. Its layout allows for natural light to flood key areas, creating a welcoming environment that promotes healing and reduces stress for both patients and staff. The clinic also blends seamlessly into The MET mixed-use building (another STW project), providing essential services in a convenient, walkable location.
  • ARH Highlands Operating Room Renovation

    Read more
    ARH Highlands Operating Room RenovationHeal
    ARH Highlands Operating Room Renovation
    STW engineered complete replacement of the HVAC equipment serving the OR suite at the facility. The renovated HVAC allows for the entire suite to be serviced from one central unit, providing uniform cooling and heating across the suite. The facility was also fitted with new variable-air-volume (VAV) boxes serving OR rooms and support spaces, allowing for each space to achieve accurate airflow per ASHRAE Standard 170-2017.
  • ARH Tug Valley Operating Room Renovation

    Read more
    ARH Tug Valley Operating Room RenovationHeal
    ARH Tug Valley Operating Room Renovation
    The mechanical design included the addition of two new hot water VAV boxes to accomidate the addition of two new classrooms. New multipurpose rooms and classrooms required existing VAV boxes to be relocated. New air devices and ductwork were designed for the media center. The electrical design included a full renovation of the reception area, various classroom, and media center. LED light fixture package and a networked, programmable digital lighting control system complete with occupancy sensing, dimming devices were provided to maximize energy savings.
  • Norton Women’s & Children’s Hospital St. Matthews: ICU Expansion

    Read more
    Norton Women’s & Children’s Hospital St. Matthews: ICU ExpansionCurrent Projects
    Norton Women’s & Children’s Hospital St. Matthews: ICU Expansion
    The Norton Women’s & Children’s Hospital ICU Expansion project is the fit-up and renovation of approximately 8,500 square feet on the second floor of the existing NWCH Building in Louisville, Kentucky. The project will provide ten new ICU rooms and upgrade two TCU rooms to better serve the hospital’s needs.
  • University of Kentucky Combs Cancer Research Building – Division of Laboratory Animal Resources

    Read more
    University of Kentucky Combs Cancer Research Building – Division of Laboratory Animal ResourcesHeal
    University of Kentucky Combs Cancer Research Building – Division of Laboratory Animal Resources
  • ARH Beckley Hospital

    Read more
    ARH Beckley HospitalHeal
    ARH Beckley Hospital
  • ARH Hospital Joe Craft Tower Expansion

    Read more
    Portfolio Pic
    ARH Hospital Joe Craft Tower ExpansionHeal
    ARH Hospital Joe Craft Tower Expansion
Copyright and beyond. Shrout Tate Wilson Consulting Engineers, PLLC
Lexington, KY Web Design by Envy Interactive